top of page
Robert Brown
Admin
Chair, STORM Coalition
More actions
Profile
Join date: Apr 6, 2023
Posts (16)
Apr 21, 2026 ∙ 2 min
Environmental Group Warns Proposed High-speed Rail Corridor Could Impact Protected Oak Ridges Moraine
PORT PERRY, ON – April 20, 2026 For Immediate Release Save the Oak Ridges Moraine (STORM) Coalition is calling on the ALTO Crown corporation to route its proposed high-speed rail line outside the Oak Ridges Moraine (ORM) and associated Greenbelt lands. The proposed ALTO study area currently encompasses approximately 28,000 hectares of the ORM and is largely situated within areas designated as Natural Core and Natural Linkage under the Oak Ridges Moraine Conservation Plan (ORMCP). These...
20
0
Mar 27, 2026 ∙ 4 min
High-Speed Rail Could Cross One of Ontario’s Most Important Water Sources
Approximately 28,000 hectares of the Oak Ridges Moraine fall within the ALTO study corridor An approximate rendering of the ALTO High Speed Rail study area (violet shading) and the Oak Ridges Moraine (outlined in black). * One of the largest infrastructure projects in Canadian history may soon cross the Oak Ridges Moraine (ORM). Preliminary analysis indicates that approximately 42.3 kilometres of the ORM fall within the ALTO high-speed rail corridor study area, representing roughly 28,000...
743
1
Dec 11, 2025 ∙ 6 min
STORM Toolbox: Why Comment on the Environmental Registry When the System Is Stacked Against You?
Ontario’s Environmental Registry of Ontario (ERO) is currently the primary way the public shapes environmentally significant laws, regulations and policies. Under the Environmental Bill of Rights (EBR), ministries are required to post proposals, consult for at least 30 days, consider the comments, and explain how feedback influenced their decisions. On paper, that sounds like a meaningful democratic process. In practice, the system is deeply compromised. The Auditor General’s 2024 performance...
58
0
bottom of page
.png)